Definition
Cumulative count of equipment items deferred from turnaround scope by AI recommendations across consecutive turnaround cycles, weighted by each item's risk score: detecting whether the "next turnaround will catch it" assumption is compounding into a growing backlog of unaddressed maintenance.
The Measurement Gap
AI turnaround scope optimization defers individual equipment items with sound rationale. Condition data does not justify the work, RBI says the inspection interval can extend, the cost-benefit case for inclusion is weak. Each decision is reviewed and approved. What no decision authorizes, and no legacy turnaround metric measures, is the cumulative effect across cycles. Turnaround scope adherence reports whether the approved scope was executed; it goes up when deferrals are approved. Turnaround cost per day measures execution efficiency. Between-turnaround failure rate is the lagging indicator that arrives years after the deferral chain started. Equipment-level risk scores exist in the RBI program but are not aggregated across turnaround cycles as a deferral history. The signature pattern (the same risk-significant equipment deferred from three or four consecutive turnarounds while individual deferral rationale always passes) is invisible without explicit cumulative tracking.
Decision Supported:
Is the AI turnaround scope optimizer creating a growing backlog of deferred equipment that no individual turnaround was designed to handle, and if so, which equipment has been deferred longest and carries the most risk?
Formula
Plain language: For every equipment item that has been deferred from at least one turnaround, count the number of consecutive deferrals and multiply by the item's risk score. Sum across all deferred items. The result is in risk-weighted deferral units.
Notation:
TSDI = Σ ( N_deferrals_e × Risk_weight_e )
Variables:
| Variable | Definition | Unit |
|---|---|---|
| N_deferrals_e | Number of consecutive turnaround cycles from which equipment item e has been deferred | count |
| Risk_weight_e | Risk score for item e from the RBI / FMEA program, reflecting consequence of failure | risk score (per program scale) |
| e | Index of equipment item with at least one deferral since last work execution | n/a |
Track TSDI per equipment item, per risk category, and as a portfolio total trended across turnaround cycles.
Proposed formula, pending validation pilots.