Fouling-Corrosion Interaction Score (FCIS)

GMI-PI-009Process IndustriesInfrastructure-DependentPattern O-19: Cross-Model Interaction

Definition

Ratio of average corrosion rate in the 60 days following a heat-exchanger cleaning to the average corrosion rate in the 60 days preceding the cleaning: detecting whether cleaning is accelerating corrosion by removing protective deposits or reducing under-deposit corrosion that was active before the cleaning.

The Measurement Gap

Heat exchanger cleaning programs and corrosion monitoring programs run on different cadences, different reporting paths, and different management chains. Cleaning is scheduled by fouling management. Corrosion is monitored by integrity management. Neither program owns the relationship between the two. The failure mode is mechanism-specific: a chemical cleaning that strips a passive scale on a carbon-steel exchanger can accelerate corrosion two to five times for thirty to sixty days while the surface re-passivates. The cleaning event is reported as a success because heat-transfer coefficient recovers. The corrosion acceleration shows up in inspection data months later and is attributed to feedstock or process variability. Heat-transfer recovery and corrosion rate are each measured; the difference of corrosion rate across a cleaning event is not, unless this metric is built.

Decision Supported:

Is the fouling model's cleaning recommendation creating a corrosion problem that the corrosion model does not account for, and if so, how much additional wall loss is each cleaning event causing?

Formula

Plain language: Pick a cleaning event. Average the corrosion rate over the 60 days before and the 60 days after. Divide post by pre. Above 1.0 means cleaning accelerated corrosion; below 1.0 means fouling was driving under-deposit corrosion and cleaning helped.

Notation:

FCIS = CR_post_clean / CR_pre_clean

Variables:

Variable Definition Unit
CR_post_clean Average corrosion rate in the 60 days following a cleaning event, measured by coupons, ER probes, LPR probes, or UT thickness surveys mils per year
CR_pre_clean Average corrosion rate in the 60 days preceding the cleaning event mils per year
Measurement basis Real-time probes preferred over coupons; coupon lag of multiple weeks distorts the pre/post split n/a

Track FCIS as a time series across cleaning events; a single event is anecdote, the trend is the signal.

Proposed formula, pending validation pilots.

At a Glance

Unit
Ratio
Trend Direction
Toward 1.0; below 1.0 means fouling was protective
Reporting Frequency
Per cleaning event, trended over service life
Category
Fouling and Catalyst Lifecycle Economics (cross-listed with Predictive Integrity)
← Cleaning Effectiveness Degradation Index (CEDI)Cross-Model Interaction Index (CMII) →

Assess Your Organization

The AI-GPS Assessment evaluates your AI governance maturity and recommends KPIs like this one for your implementation roadmap.

Take the Free AI-GPS Assessment