Outage Access Window Consumption Index (OAWCI)

GMI-NUC-009Nuclear OperationsPilot-Ready

Definition

Percentage of outage-access-limited maintenance and inspection tasks that the AI schedule optimizer recommended deferring to a future outage, weighted by the interval between access opportunities.

The Measurement Gap

Nuclear outages provide the only access window for many inspections and maintenance activities. The interval between access opportunities is typically 18 to 24 months, and for some components even longer. When an AI schedule optimizer recommends deferring an access-limited task to a future outage, the deferral cost is not a few weeks of delay but an entire operating cycle. Legacy outage metrics track schedule adherence, critical path duration, and outage cost. None of them measure how many access-limited tasks the optimizer recommended deferring or weight those deferrals by the time until the next access opportunity. Capacity factor captures generation output. Outage duration metrics capture schedule performance. PM completion rate tracks whether work got done during the outage. The invisible failure mode is that the optimizer trades long-cycle inspection and maintenance deferrals for short-term schedule gains, and the deferred work compounds silently across operating cycles because no metric tracks the access-weighted deferral burden.

Decision Supported

Is the outage optimizer trading schedule performance for inspection and maintenance debt that will compound across operating cycles?

Formula

Plain language: Identify all maintenance and inspection tasks that can only be performed during outage (because the component is inaccessible or the system must be drained/de-energized). Count how many the AI optimizer recommended deferring. Weight each deferral by how long until the next access opportunity: deferring a task accessible every outage (18 months) is less concerning than deferring a task accessible only every other outage (36 months) or one requiring a specific plant condition that occurs rarely.

Notation:
OAWCI = Σ (d_i × w_i) / Σ w_i

Where d_i = 1 if task i was deferred, 0 if performed

Variables:

  • d_i = deferral indicator for task i (1 = AI recommended deferral and deferral was accepted, 0 = task performed)
  • w_i = access interval weight for task i (months until next access opportunity / 18). A task with 18-month access = weight 1.0, 36-month = 2.0, 54-month = 3.0, single-opportunity = 5.0
  • i = each access-limited task in the outage work scope (count)

Sign convention: OAWCI = 0.0 means no access-limited tasks deferred. Higher is worse. The weighted formulation ensures that long-cycle deferrals drive the index more than short-cycle ones.

Aggregation period: Per outage.

Edge Cases

  • Task deferred because the condition-based assessment shows it's genuinely not needed: tag as "condition-based deferral" and track separately from "schedule-driven deferral". OAWCI should primarily capture schedule optimization deferrals, not legitimate condition-based decisions
  • Task deferred but a partial inspection or monitoring alternative was substituted: weight at 0.5 rather than 1.0 if the alternative provides meaningful coverage of the most significant failure modes
  • First outage after AI optimizer deployment: no baseline exists. Establish OAWCI and compare against the historical deferral rate from pre-AI outage planning

Proposed formula, pending validation pilots.

At a Glance

Unit
Percentage
Trend Direction
Higher
Reporting Frequency
Per refueling outage
Category
Risk and Margin Accumulation
← Cumulative Risk Deferral Burden (CRDB)Concurrent Maintenance Risk Density Index (CMRDI) →