Definition
Rate of downstream equipment failures following an upstream equipment healthy assessment.
The Measurement Gap
What This Metric Measures
CEDFR measures the rate at which equipment failures in dependent systems occur within the prediction window of an upstream equipment's healthy assessment. It tracks whether independent PdM models miss cascading risk across the equipment dependency chain: the turbocharger model says healthy, but turbocharger fouling is accelerating economizer tube degradation that a separate model cannot see.
The Decision It Supports
Are the PdM models accounting for cross-equipment dependencies, or is a healthy turbocharger assessment blinding the organization to accelerated degradation in downstream equipment? When the turbocharger model reports healthy and the superintendent approves deferring turbocharger maintenance, nobody checks whether the turbocharger's current condition is creating stress on the economizer, exhaust valves, or scavenge air cooler. CEDFR measures whether these blind spots produce actual downstream failures.
Why Legacy Metrics Cannot See This
Traditional maintenance metrics track equipment failures independently. MTBF for turbochargers and MTBF for economizers are computed in isolation. No metric connects an upstream assessment to a downstream outcome. When the economizer fails 1,500 running hours after the turbocharger was assessed as healthy, the two events are recorded in separate equipment histories with no causal link. CEDFR builds the dependency chain and measures whether healthy assessments on upstream equipment predict or fail to predict downstream consequences.
Formula
Primary Formula
CEDFR = Downstream_failures_after_upstream_healthy / Total_upstream_healthy_assessments
Variable Definitions
- Downstream_failures_after_upstream_healthy = count of unplanned failures or significant degradation events in downstream equipment within N running hours of an upstream equipment healthy assessment
- Total_upstream_healthy_assessments = count of healthy/no-action-needed assessments issued for upstream equipment that has known dependent downstream systems
- N = dependency window, proposed at 2,000 running hours, adjustable by equipment pair based on the thermal and mechanical coupling strength
Units: Rate (0 to 1). Lower is better. The rate represents the probability that a healthy upstream assessment is followed by a downstream failure within the dependency window.
Edge Cases
Downstream failures might be unrelated to upstream condition: engineering judgment is required to define dependency pairs and distinguish causal from coincidental failures. When multiple upstream items affect the same downstream equipment, attribute only if the relevant upstream condition could causally contribute. Minimum sample of 30 upstream healthy assessments per equipment dependency pair per year is required for meaningful measurement. Key dependency pairs include turbocharger-to-economizer, main engine-to-shaft generator, purifier-to-engine, and cooling system-to-all-consumers.
Proposed formula, pending validation pilots.