Definition
DRCMI measures whether emergency power capacity margins remain adequate after demand response load shedding under current clinical conditions.
The Measurement Gap
The Decision This KPI Enables:
If a utility outage occurs during a demand response event, does the emergency generator system have sufficient capacity to sustain all critical clinical loads plus the restoration requirements of curtailed loads, or does the combination of demand response curtailment and high clinical census create a capacity margin below the safety threshold?
Why Legacy Metrics Miss This:
Traditional demand response metrics track energy savings, curtailment compliance, and grid reliability contribution. Emergency generator metrics track fuel supply, test results, and transfer switch performance. These operate as separate measurement domains. No legacy metric evaluates the intersection: what happens when both conditions are active simultaneously.
The gap is a conditional risk that emerges only when two independent optimization objectives collide. The demand response system optimizes for energy cost reduction and grid support. The emergency power system is designed for utility outage scenarios. Neither system's metrics account for the scenario where both activate concurrently. During a demand response event, the building has already shed non-critical loads and is operating in a reduced-capacity mode. If a utility outage occurs in this state, the emergency generators must power all critical loads plus restore the loads that were curtailed for demand response, because the curtailment was from grid power that no longer exists.
DRCMI measures the capacity margin under this combined scenario. It evaluates whether the emergency generator system can sustain the critical clinical load during a demand response event at current census, providing a real-time safety margin that demand response programs can use as a participation constraint. Without DRCMI, demand response decisions are made without visibility into the emergency power consequence, and the safety margin violation is discoverable only during an actual concurrent event.
Formula
DRCMI = ((G_capacity − L_critical_DR) / G_capacity) × 100
Where:
- G_capacity = Total emergency generator sustained output capacity (kW) at current ambient conditions
- L_critical_DR = Total critical load (kW) that emergency generators must sustain during a demand response event, including: all life safety loads, all critical clinical loads at current census, and curtailed loads that must be restored if grid power is lost during the demand response window
Unit of Measure: Percentage (0-100%+), where higher values indicate greater safety margin
Measurement Frequency: Real-time during demand response events; daily modeling during demand response enrollment periods; monthly during non-enrollment periods
Data Requirements:
- Emergency generator nameplate capacity with ambient temperature derating curve
- Real-time critical load measurement from emergency power distribution monitoring
- Current clinical census data: OR case count, ICU bed occupancy, imaging equipment active status
- Demand response curtailment schedule: which loads are curtailed and their power draw at time of curtailment
- Generator maintenance status: any units offline for maintenance that reduce available capacity
Calculation Notes: G_capacity must reflect actual available capacity, not nameplate capacity. Generators derate at high ambient temperatures, and units offline for maintenance or testing reduce the available pool. L_critical_DR must include load restoration requirements: loads curtailed during demand response that would need generator power if the grid fails during the event. The restoration load is not the same as the curtailed load; some curtailed loads may remain shed during a generator event, but others (kitchen refrigeration, server rooms, elevators) must be restored immediately.
Proposed formula, pending validation pilots.