Maintenance Window Assumption Currency (MWAC)

GMI-HC-041HealthcareIntegration-Required

Definition

MWAC measures the temporal validity of simulation-derived maintenance window approvals.

The Measurement Gap

The Decision This KPI Enables:

When a simulation model approves a maintenance window, are the operating assumptions that justified the approval still valid at the time the maintenance is scheduled to begin?

Why Legacy Metrics Miss This:

Traditional maintenance scheduling metrics track whether maintenance starts on time and finishes within the allocated window. They do not validate whether the conditions that justified the window still exist when the work begins. A maintenance window approved based on a simulation showing adequate system redundancy during a low-census period remains "approved" in the scheduling system even after conditions change to invalidate the original assumptions.

The gap is temporal. Simulation models evaluate feasibility at the time of planning, typically 24-72 hours before the scheduled work. Hospital operating conditions change continuously: surgical schedules shift as emergency cases arrive, patient census fluctuates with admissions and discharges, and building loads vary with weather and occupancy. By the time the maintenance window arrives, the conditions may be fundamentally different from the simulation's assumptions.

MWAC measures the staleness of the assumptions underlying approved maintenance windows. It compares key parameters at the time of simulation approval (surgical case count, patient census, building load, equipment staging) against the same parameters at the time of scheduled maintenance start. When the parameters have changed beyond a defined tolerance, the maintenance window's approval is stale: the simulation would need to be re-run against current conditions to confirm feasibility. Without MWAC, organizations proceed with maintenance windows based on obsolete approvals, creating risk that the simulation was designed to prevent.

Formula

MWAC = (MW_current / MW_approved) × 100

Where:

  • MW_current = Count of approved maintenance windows where key operating assumptions remained within tolerance at the time of scheduled start
  • MW_approved = Total count of simulation-approved maintenance windows in the measurement period

Unit of Measure: Percentage (0-100%)

Measurement Frequency:

Weekly, with daily monitoring during high-census or high-acuity periods

Data Requirements:

  • Simulation model inputs at time of approval: surgical schedule, patient census, building load forecast, equipment staging plan
  • Actual operating conditions at scheduled maintenance start time: current surgical schedule, actual census, measured building load, actual equipment status
  • Tolerance thresholds per parameter: the percentage change that constitutes a "stale" assumption (e.g., surgical case count change >20%, census change >15%, building load change >10%)
  • Maintenance window records with approval timestamp, scheduled start time, and approval-to-start elapsed time

Calculation Notes: Tolerance thresholds should be system-specific. A chiller plant maintenance window may tolerate 15% building load variation because redundant capacity provides margin, while an OR suite HVAC shutdown window may tolerate only 5% surgical schedule variation because backup ventilation capacity is limited. Organizations should calibrate tolerances based on system redundancy and clinical impact, not on a single universal threshold.

Proposed formula, pending validation pilots.

At a Glance

Category
Simulation Fidelity - Scheduling Model Accuracy
← Demand Response Capacity Margin Index (DRCMI)Clinical Impact Priority Accuracy (CIPA) →

Assess Your Organization

The AI-GPS Assessment evaluates your AI governance maturity and recommends KPIs like this one for your implementation roadmap.

Take the Free AI-GPS Assessment