FTR Topology Exposure Index (FTEI)

GMI-EU-029Energy & UtilitiesIntegration-Required

Definition

Measures the percentage of the FTR portfolio's notional value that rests on congestion paths where the underlying grid topology has changed since the valuation model was last calibrated.

The Measurement Gap

Traditional FTR portfolio management tracks position size, forward price curves, historical settlement results, and total notional exposure. These metrics describe what the portfolio holds and what it has earned. They do not systematically track whether the grid topology underlying each position's valuation remains current, that is, whether the congestion path the position was built on still exists in the physical network with the same characteristics.

The specific fall-short: FTR valuation models are calibrated at a point in time. Between calibrations, the grid changes: new transmission facilities come into service, generators retire or mothball, sustained outage patterns alter normal power flow. Each change may redirect power flows, reduce or eliminate congestion on previously congested paths, or open new congestion corridors. Positions valued before these changes continue to be marked at valuations that the altered grid no longer supports.

The exact operational decision FTEI enables:

which FTR positions to review, recalibrate, or unwind following topology changes, and whether to accelerate the valuation model's recalibration cycle.

What goes wrong without this information:

the utility holds FTR positions on congestion paths that have been topologically altered. P&L underperforms expectations not because congestion forecasts were wrong but because the grid the positions were built on no longer exists. The loss is attributed to "market conditions" rather than stale topology assumptions in the valuation model.

How AI/ML makes this measurement possible:

modern ETRM systems and topology change tracking databases can be joined on position path identifiers. AI-enabled grid state monitoring can flag topology changes in near-real-time, enabling the Boolean flag that FTEI requires for each position rather than relying on periodic manual reviews.

Formula

FTEI = Σ(Notional_i | topology_changed_i = TRUE) / Σ(Notional_i)

Variables:

Notional_i: notional value of FTR position i ($). Source: ETRM or FTR management system, portfolio position records

topology_changed_i: Boolean flag indicating whether the source-sink path for position i has experienced a topology change since the valuation model's last calibration date. Source: OASIS transmission service requests, outage management system, ISO/RTO generation interconnection queue, and NERC-approved rating change notices

Topology change defined as: any new transmission facility placed in service, generation unit retirement or mothball, sustained outage pattern change exceeding 30 days on a path facility, or NERC-approved rating change affecting a limiting element on the source-sink path

Calculation Frequency: Computed at each portfolio review cycle (recommended weekly or upon any topology change event). Updated in near-real-time as topology change flags are applied.

Edge Cases:

Routine maintenance outages shorter than 30 days should not trigger the topology change flag. Only sustained changes that alter the statistical distribution of power flow on the path. If the valuation model is recalibrated frequently (weekly), FTEI will trend low by construction; in that case, track recalibration frequency separately as a process metric.

Output:

Percentage of total portfolio notional value. 0% indicates all positions are valued on current topology. Below 10% is manageable. Above 25% warrants immediate recalibration. Action trigger: FTEI exceeding 20% triggers accelerated valuation model recalibration and individual position review on all flagged paths.

Proposed formula, pending validation pilots.

At a Glance

Category
Grid Operations, Dispatch, and Edge Autonomy

Decision Supported

How much of our FTR portfolio is being valued with stale assumptions, and which positions should be reviewed or unwound?

← FLISR Asset Impact Score (FAIS)Grid-Edge Control Coherence Index (GECCI) →