Definition

Cumulative thermal stress imposed on reroute-path equipment by FLISR-driven load transfers: measuring the asset health cost of automated restoration decisions that SAIDI doesn't see.

The Measurement Gap

Traditional reliability metrics (SAIDI, SAIFI, CAIDI) measure the customer-visible outcome of distribution switching events. They improve when FLISR restores customers quickly, regardless of what happened to equipment on the reroute path. Equipment condition scores and annual inspection data capture asset health at discrete survey intervals but cannot detect the incremental aging imposed by a single four-hour overload event on a reroute path.

The specific fall-short: FLISR operations are logged by the OMS as successful or unsuccessful. The success criterion is whether customers were restored. No standard system joins the FLISR event log to the thermal loading record of reroute-path equipment during the event window. The thermal stress imposed on a $2M substation transformer during a FLISR reroute is invisible to every metric in current use.

The exact operational decision FAIS enables:

identifying which reroute paths consume the most equipment life per FLISR operation, so that protection engineers can either upgrade capacity on those paths or modify the switching sequence to distribute load more evenly.

What goes wrong without this information:

FLISR operations are optimized for customer-minutes saved with no visibility into the asset health cost of each restoration. A reroute path that is repeatedly used as the primary alternative accumulates accelerated aging that only becomes visible when the equipment fails: attributed to "age" rather than to the cumulative stress of serving as the FLISR workhorse.

How AI/ML makes this measurement possible:

SCADA systems now capture thermal loading at one- to five-minute intervals during normal and post-switching conditions. IEEE C57.91 thermal life models are well-established. AI dispatch logs record exactly which reroute sequences were executed. Joining these three data streams is the measurement that FAIS formalizes.

Formula

FAIS = Σ(Aging_equivalent_hours_j × Asset_value_j) / N_FLISR_events

Variables:

Aging_equivalent_hours_j: accelerated aging in equivalent life-hours for asset j on the reroute path, calculated from thermal loading above nameplate rating during the FLISR event duration (for transformers, computed per IEEE C57.91 insulation aging model; for other equipment, per manufacturer thermal life curves (equivalent hours)) Source: SCADA thermal loading records joined to FLISR event timestamps

Asset_value_j: replacement cost of asset j ($). Source: asset registry or capital planning database; used as a weighting factor so aging on a high-value substation transformer receives proportionally greater weight than aging on a distribution transformer

N_FLISR_events: total FLISR switching operations in the measurement period. Source: FLISR event log from OMS or automation system

Calculation Frequency: Per FLISR event (real-time or batch following the event), aggregated monthly.

Edge Cases:

If the FLISR reroute stays within normal ratings throughout the event, the aging equivalent hours contribution is zero. This is the desired outcome and should be explicitly logged. For closely-spaced FLISR events on the same reroute path (common during storm sequences), compute thermal stress continuously rather than resetting between events; equipment does not return to baseline temperature between closely-spaced operations.

Output:

Dollar-weighted aging-equivalent hours per FLISR event. Below $500/event is within acceptable bounds. Above $2,000/event indicates meaningful asset life consumption per restoration. Any single reroute path accumulating annual FAIS exceeding 5% of that path's transformer replacement cost triggers an engineering review.

Proposed formula, pending validation pilots.

At a Glance

Category
Grid Operations, Dispatch, and Edge Autonomy

Decision Supported

How much equipment life is the utility spending on each automated restoration, and is the SAIDI improvement worth the accelerated aging?

← Dispatch Model Regime Alignment Index (DMRAI)FTR Topology Exposure Index (FTEI) →

Assess Your Organization

The AI-GPS Assessment evaluates your AI governance maturity and recommends KPIs like this one for your implementation roadmap.

Take the Free AI-GPS Assessment