Definition
Measures the facility's actual power redundancy position (UPS runtime, generator readiness, and battery state of charge) during demand response and grid arbitrage events, compared to design-specification minimum redundancy requirements.
The Measurement Gap
AI power management systems participate in demand response programs and grid arbitrage by dispatching UPS battery capacity and scheduling generator operation. The revenue from grid participation is measurable. What is not measured is the redundancy cost: every unit of battery capacity dispatched to the grid reduces the facility's reserve for a genuine power failure that might occur during the same dispatch window. Battery SOC as a standalone metric shows capacity: it does not show whether that capacity meets the design-specification minimum for UPS function. Uptime measured over long periods cannot see the narrow windows during grid events when redundancy margin is reduced to levels the design never intended. The consequence of a grid failure coinciding with a low-RPDGI event is an outage caused by availability margin that was traded for energy revenue.
Decision Supported:
When the AI participates in grid interaction, does the facility still meet its design-basis redundancy requirements, or is the AI trading availability margin for energy revenue?
Formula
Plain language: During each grid interaction event, find the minimum across three redundancy indicators: battery SOC relative to design minimum, estimated UPS runtime relative to design runtime, and available generator capacity relative to required generator capacity. The minimum of the three reflects the weakest link in the redundancy chain.
Notation:
RPDGI = min(SOC_min_event / SOC_design_minimum, Runtime_actual / Runtime_design, Generator_available / Generator_required)
Variables:
| Variable | Definition | Unit |
|---|---|---|
| SOC_min_event | Minimum battery state of charge recorded during the grid interaction event | % |
| SOC_design_minimum | Design-basis minimum SOC for UPS function (e.g., 85% for 15-minute runtime) | % |
| Runtime_actual | Estimated UPS runtime at current load and SOC during the event | Minutes |
| Runtime_design | Design-specification UPS runtime | Minutes |
| Generator_available | Available generator capacity during the event | kW |
| Generator_required | Minimum generator capacity per design redundancy specification | kW |
Report RPDGI per event and track the distribution of event RPDGI values over time.
Proposed formula, pending validation pilots.