Relay Outcome Differential (ROD)

GMI-TF-018Fleet & TransportationIntegration-Required

Definition

Difference in delivery quality metrics between AI-recommended relay loads and comparable through-run loads on the same lanes, revealing whether relay decisions save money net of any service quality degradation they introduce.

The Measurement Gap

Relay decisions are evaluated on their cost efficiency without accounting for the service quality trade-offs they create. The blind metrics include:

Cost per load: compares relay and through-run economics but never connects the cost savings to the service quality outcomes on those same loads. A relay that saves $200 in driver costs but generates a $500 damage claim and a lost customer never shows up as a net loss.

Relay savings reports: track estimated savings from HOS-optimized relay recommendations as a standalone figure, divorced from service outcome data. The savings are reported; the service failures are reported separately in a different dashboard by a different team.

On-time delivery rate (aggregate): blends relay and through-run loads into a single OTD figure that masks whether relays systematically underperform. A fleet running 92% OTD overall could have 95% OTD on through-runs and 82% on relays: the aggregate hides the pattern.

The fundamental gap: no metric compares relay and through-run outcomes on a lane-matched, apples-to-apples basis. Without this comparison, fleets cannot determine whether relay recommendations are genuinely net-positive or simply shifting costs from one line item (driver expense) to another (service degradation, claims, customer churn).

Decision Supported:

Are relay recommendations saving money net of service quality degradation, or are they moving costs between budget lines while eroding delivery performance?

Formula

Plain Language

ROD compares delivery outcomes for relay loads against through-run loads on matched lanes. Each quality dimension (on-time delivery, damage rate, customer complaints) is measured separately as the difference between relay and through-run performance. A composite score averages the three normalized differentials. A separate economic calculation determines whether the HOS savings from relays exceed the costs of any service degradation.

Notation

$$ROD_{metric} = Outcome_{relay} - Outcome_{through}$$

Component metrics computed separately:

  • $ROD_{OTD} = OTD_{relay} - OTD_{through}$
  • $ROD_{damage} = DamageRate_{relay} - DamageRate_{through}$
  • $ROD_{complaint} = ComplaintRate_{relay} - ComplaintRate_{through}$

Composite:
$$ROD = \frac{1}{3}\sum(ROD_{metric,normalized})$$

Each metric normalized to 0–1 scale before averaging.

Net economic:
$$ROD_{cost} = (HOS_savings \times relay_count) - (excess_damage_claims + service_penalties)$$

Variables

Variable Description Source
ROD_OTD On-time delivery differential between relay and through-run loads on matched lanes TMS delivery records
ROD_damage Damage rate differential between relay and through-run loads TMS + claims system
ROD_complaint Customer complaint rate differential TMS + CRM
HOS_savings Estimated per-relay cost savings from hours-of-service optimization ELD + TMS derived
relay_count Number of relay loads in measurement period TMS
excess_damage_claims Incremental damage claims attributable to relay handling Claims system
service_penalties Contractual penalties triggered by relay-related service failures TMS + contract management
ROD_cost Net economic outcome: negative means relays cost more than they saved Derived composite

Proposed formula, pending validation pilots.

At a Glance

Unit
Percentage
Trend Direction
Lower; approaching 0
Reporting Frequency
Quarterly
Category
AI Dispatch Decision Quality
← Driver-Load Proficiency Match Score (DLPMS)DQ File Classification Accuracy (DQCA) →

Assess Your Organization

The AI-GPS Assessment evaluates your AI governance maturity and recommends KPIs like this one for your implementation roadmap.

Take the Free AI-GPS Assessment