Supplier Lead Time Trust Index (SLTTI)

GMI-RET-004Retail OperationsPilot-Ready

Definition

Mean absolute deviation between the lead times the autonomous replenishment system uses and the actual lead times observed, measured by supplier and SKU category.

The Measurement Gap

Autonomous replenishment systems calculate when to order based on lead time assumptions stored in master data. When those assumptions are wrong, every order the system places arrives too early or too late. Supplier performance scorecards typically measure on-time delivery rate, which captures whether the supplier meets the agreed delivery window but not whether the lead time assumption in the ordering system matches reality. A supplier can be 95% on-time against a 14-day contractual lead time while the replenishment system is using a 10-day assumption, which means every "on-time" delivery arrives 4 days later than the system expected. Inventory turnover reflects the consequences of ordering timing errors but cannot trace them back to stale lead time data. Days of supply fluctuates for many reasons, making it impossible to isolate lead time assumption drift as a root cause. Purchase order cycle time measures procurement process speed, not the accuracy of the parameters driving autonomous ordering decisions. The result is an autonomous system that orders with confidence based on data that quietly diverges from operational reality, generating systematic inventory misallocation that no existing metric surfaces.

Decision Supported:

Are the lead time assumptions driving autonomous ordering decisions still accurate, or is the system ordering based on stale data?

Formula

Plain language: For each purchase order received, compare the lead time the system assumed when it placed the order to the actual lead time (PO date to receipt date). Average the absolute difference as a proportion of the assumed lead time.

Notation:

SLTTI = 1 - (1/N) x SUM(|LT_assumed_i - LT_actual_i| / LT_assumed_i)

Variables:

Variable Definition Unit
SLTTI Supplier Lead Time Trust Index Index (0 to 1)
LT_assumed_i Lead time in master data at the time order i was placed Days
LT_actual_i Actual elapsed time from PO placement to goods receipt for order i Days
N Number of completed POs in the measurement period Count

Proposed formula, pending validation pilots.

At a Glance

Unit
Index (0 to 1)
Trend Direction
Higher; approaching 1.0
Reporting Frequency
Quarterly by supplier
Category
Demand Intelligence and Inventory Risk
← Safety Stock Tail-Risk Exposure Score (STRES)Loss Prevention Intervention Equity Index (LPIEI) →

Assess Your Organization

The AI-GPS Assessment evaluates your AI governance maturity and recommends KPIs like this one for your implementation roadmap.

Take the Free AI-GPS Assessment