Rebalancing Availability Impact Score (RBAIS)

GMI-RE-032Renewable EnergyIntegration-RequiredPattern O-6: Autonomous Coherence

Definition

RAIS measures the frequency with which a site experiences a parts stockout within 30 days of having that part transferred out by the inventory rebalancing optimizer. This metric reveals whether portfolio-level optimization creates site-level shortages, capturing the autonomous coherence failure where the fleet optimizer improves aggregate metrics while degrading individual site performance.

The Measurement Gap

The Measurement Gap

Fleet-level inventory rebalancing optimizers move parts between sites based on demand predictions, consumption patterns, and criticality assessments. When the algorithm determines that Site A has excess stock of a bearing and Site B has a predicted need, it initiates a transfer. This rebalancing is rational from the portfolio perspective because it reduces total inventory investment while maintaining aggregate availability. The question RAIS asks is what happens to Site A after the transfer.

If Site A experiences an unplanned failure requiring that bearing within 30 days of the transfer, it now faces a stockout caused directly by the rebalancing decision. The emergency procurement cost, extended downtime, and revenue loss at Site A are the negative externality of the portfolio optimization. The fleet inventory report shows improved aggregate performance. The site report shows a stockout and extended downtime that would not have occurred without the transfer.

Without RAIS, organizations optimize fleet inventory without measuring the site-level cost. Rebalancing algorithms are evaluated on aggregate metrics (total inventory value, fleet-wide stockout rate) that improve even when individual sites suffer. A fleet stockout rate of 2% could include two sites with zero stockouts and one site with a 6% stockout rate driven entirely by parts that were transferred away.

The Decision This Metric Supports

RAIS answers whether the inventory rebalancing algorithm is considering the residual risk at the source site when it moves parts. When RAIS is below 3%, very few rebalanced parts were needed at their source site, and the rebalancing algorithm is making sound decisions. When RAIS exceeds 10%, the algorithm is actively hurting site-level availability, and a minimum residual stock constraint is needed.

Formula

Primary Formula:

RAIS = Post_Transfer_Stockouts / Total_Rebalancing_Transfers x 100

Where:

Variable Definition
Post_Transfer_Stockouts count of instances where the source site needed the transferred part within 30 days of the transfer (work order opened requiring that part AND the site had to emergency-order or wait for replenishm...
Total_Rebalancing_Transfers all optimizer-initiated parts transfers between sites in the measurement period

Measurement frequency: Monthly. Each rebalancing transfer is tracked as it occurs, and the 30-day stockout window is monitored continuously.

Segmentation requirements: Track RAIS by part criticality and by part lead time. A 5% RAIS rate for commodity parts with 3-day lead times is less concerning than a 5% rate for critical spares with 90-day lead times. The dollar impact of each post-transfer stockout is dramatically different based on lead time and downtime cost.

Edge cases requiring special handling:

  • "Needed the part" must be precisely defined. The site must have opened a work order requiring that specific part AND experienced a stockout (could not fulfill from on-site inventory). If the site needed the part but had additional units in stock, no stockout occurred and the transfer did not cause harm.
  • Transfers for parts with very short replenishment lead times (under 3 days): the 30-day stockout window is less meaningful because replenishment arrives quickly. Segment by lead time and evaluate whether the short-lead parts should be excluded from RAIS or tracked with a shorter stockout window.
  • Multiple transfers of the same part from the same site in rapid succession: each transfer is a separate event for RAIS purposes. Rapid sequential transfers amplify the source site's stockout risk and should be flagged as a pattern.

Proposed formula, pending validation pilots.

At a Glance

Unit
Percentage
Trend Direction
Lower; fewer post-transfer stockouts
Reporting Frequency
Monthly
Category
Parts and Inventory Decision Quality
← Parts Demand Forecast Accuracy (PDFA)Certification Verification at Assignment Rate (CVAR-RE) →

Assess Your Organization

The AI-GPS Assessment evaluates your AI governance maturity and recommends KPIs like this one for your implementation roadmap.

Take the Free AI-GPS Assessment