Definition
On-time completion rate for compliance-tagged work orders divided by the overall on-time rate. Below 1.0 means the scheduler is systematically deprioritizing compliance work relative to everything else while the overall metric stays green.
The Measurement Gap
AI-driven maintenance scheduling in renewable energy optimizes for asset availability and revenue protection. The scheduler's cost function weights each work order by its impact on production and assigns priority accordingly. Regulatory compliance work, NERC inspections, OSHA safety checks, EPA environmental monitoring, FAA obstruction lighting verification, generates no immediate revenue. In the optimizer's calculus, compliance work always competes unfavorably with production-protecting maintenance.
The measurement gap is that no one measures whether the scheduler is systematically deprioritizing compliance work. Total on-time completion rates look acceptable because revenue-protecting work is completed aggressively. But when compliance work is separated from the overall metric, a different pattern emerges. NERC inspections slip by two weeks while turbine repairs are completed on time. OSHA fall protection checks are deferred while inverter replacements are prioritized.
CSSI makes this pattern visible by computing the ratio of compliance on-time completion to overall on-time completion. A CSSI below 1.0 means compliance work is systematically late relative to other work. The segregation is not intentional; it is a natural consequence of an optimizer that weights priority by revenue impact without an explicit compliance constraint.
The decision CSSI supports is whether the AI maintenance scheduler treats compliance work as equally urgent as production maintenance, or whether it is systematically pushing compliance tasks later because they do not generate immediate revenue, creating regulatory risk that accumulates quietly until an audit or incident reveals the gap.
Formula
Compute the on-time completion rate for compliance-tagged work orders separately from the overall on-time rate. Divide the compliance rate by the overall rate. If the result is below 1.0, compliance work is being deprioritized relative to other maintenance work.
Formula (Notation):
CSSI = OTR_compliance / OTR_overall
Variable Definitions:
| Variable | Definition |
|---|---|
| OTR_compliance | percentage of regulatory compliance work orders completed by their scheduled due date |
| OTR_overall | percentage of all work orders completed by their scheduled due date |
Edge Cases and Measurement Boundaries:
Work orders must be correctly tagged as regulatory compliance for CSSI to be accurate. Audit tagging completeness before measuring. Weather delays affecting compliance work should be normalized if they affect all work types equally. Different compliance types may have different deprioritization patterns, so segment CSSI by regulatory body (NERC, OSHA, EPA, FAA) to identify where the scheduling bias is strongest.
Proposed formula, pending validation pilots.