Definition
The incremental asset degradation cost attributable to dispatching decisions that prioritize schedule performance over asset condition recommendations, measured per dispatching override event.
The Measurement Gap
The dispatching algorithm routes a consist through a congested corridor to maintain schedule, adding 40,000 gross tons of loading to a track segment that CBM says is approaching intervention threshold. The schedule looks great. The track degrades faster than planned. No metric connects the dispatching decision to the infrastructure cost. On-time performance measures schedule adherence. Track condition metrics measure degradation. Nothing connects the two.
Decision Supported:
When the dispatcher overrides a maintenance recommendation to keep a train on schedule, what does that decision actually cost in accelerated asset degradation?
Formula
Plain language: For each dispatch override (train routed or continued despite a maintenance recommendation), estimate the incremental degradation cost by comparing the stress imposed to what the maintenance-recommended alternative would have imposed.
Notation:
DIASI = SUM(delta_C_j) / N_override
Where: delta_C_j = (S_actual_j - S_recommended_j) x R_degradation
Variables:
| Variable | Description | Unit |
|---|---|---|
| S_actual_j | Stress imposed by the actual dispatching decision (gross tons, operating hours) | Varies by asset |
| S_recommended_j | Stress from the maintenance-recommended alternative | Same units |
| R_degradation | Marginal degradation cost per unit of stress for the asset type | $/GTM or $/hour |
| N_override | Dispatch events where actual decision differed from maintenance recommendation | Count |
Sign Convention: Lower is better. Higher = dispatching decisions are consuming asset life to maintain schedule.
Proposed formula, pending validation pilots.