Definition
Ratio of on-time completion for GMP compliance activities to on-time completion for all scheduled activities. Below 1.0 means the optimizer is consuming compliance schedule margin to protect production throughput.
The Measurement Gap
The AI scheduling optimizer maximizes production throughput while "respecting compliance deadlines." It does this by treating compliance activities as constraints with due dates and production as objectives to maximize. The result: environmental monitoring reviews that used to complete 15 days before deadline now finish with 3 days to spare. No deadlines are missed. The compliance team reports 100% on-time completion.
But the system is fragile. A single unexpected deviation or equipment failure will push those 3-day-buffer activities past their deadlines. The scheduler consumed all compliance margin because production activities were more "valuable" in its optimization function. In pharmaceutical manufacturing, those lower-weighted activities are the ones that keep your operating license.
Decision enabled:
When GASSI drops below 0.95, the organization monitors the trend. Below 0.85 means systematic deprioritization requiring hard scheduling constraints on compliance activities. Below 0.80 requires immediate reconfiguration of the scheduler's priority weights.
Formula
GASSI = OTR_compliance / OTR_overall
Where OTR_compliance is the on-time completion rate for GMP compliance activities and OTR_overall is the on-time completion rate for all scheduled activities.
Worked Example:
Manufacturing site Q3 performance:
Total scheduled activities: 347. Completed on time: 312. OTR_overall = 312/347 = 89.9%.
GMP compliance activities: 83. Completed on time: 71. OTR_compliance = 71/83 = 85.5%.
GASSI = 85.5% / 89.9% = 0.951
Just above the 0.95 threshold, but the trend matters. Q1 GASSI was 0.988. Q2 was 0.971. Q3 is 0.951. Quarter-over-quarter decline indicates progressive deprioritization. Digging deeper: calibration activities had 92.3% OTR (healthy), but environmental monitoring reviews had 73.1% OTR, dragging down the composite. The scheduler was specifically deferring EM reviews because they had the most flexible windows.
Sign Convention:
1.0 or above means parity. Below 0.95 warrants monitoring. Below 0.85 means systematic deprioritization. Below 0.80 requires adding hard scheduling constraints.
Proposed formula, pending validation pilots.