Definition
Aggregate risk carried by predictive maintenance deferrals on GxP-critical assets, weighting each deferral by model uncertainty, failure consequence including requalification, and the share of remaining useful life consumed.
The Measurement Gap
Predictive maintenance models give the maintenance team "permission to defer" by providing remaining useful life estimates. Every time the model says "14 days remaining," production shows a campaign running through day 12, and the planner defers to day 15. Over 18 months, 13 of 20 monitored GxP-critical assets accumulate at least one deferred maintenance action, and 4 have three or more deferrals stacked. The model's RUL estimates have confidence intervals nobody examines: "14 days ± 6 days" means actual failure could be anywhere from 8 to 20 days. MTTR doesn't see this because it measures repair time after failure, not pre-failure risk accumulation. Schedule compliance looks fine because deferred actions are rescheduled and the new schedule is met. Equipment uptime is stable because nothing has failed yet. The accumulated deferral risk across the GxP-critical fleet is invisible to every standard maintenance metric.
Decision Supported:
How much deferred maintenance risk has accumulated across the GxP-critical equipment fleet based on predictive model recommendations, and is the backlog approaching an unacceptable risk threshold?
Formula
GDMRI = Σ [(1 − C_i) × K_i × (t_deferred_i / RUL_i)]
Where C_i is model confidence for asset i, K_i is unplanned failure consequence in dollars (repair + requalification + lost production), t_deferred_i is days deferred, and RUL_i is predicted remaining useful life in days.
Worked Example:
Three GxP-critical assets with deferred maintenance:
Asset A (lyophilizer): C = 0.82, K = $450K, deferred 11 days against RUL of 14 days. Risk contribution: (1 − 0.82) × 450,000 × (11/14) = $63,643.
Asset B (filling machine): C = 0.71, K = $680K, deferred 6 days against RUL of 9 days. Risk contribution: (1 − 0.71) × 680,000 × (6/9) = $131,516.
Asset C (autoclave): C = 0.90, K = $180K, deferred 4 days against RUL of 21 days. Risk contribution: (1 − 0.90) × 180,000 × (4/21) = $3,429.
GDMRI = $63,643 + $131,516 + $3,429 = $198,588.
Asset B contributes 66% of total fleet risk, a high-consequence asset with low model confidence two-thirds through its RUL estimate.
Sign Convention:
Lower is better. Zero means no deferred maintenance risk. Rising trend signals systematic deferral accumulation.
Proposed formula, pending validation pilots.