Supply Deferral Compounding Index (SDCI)

GMI-MROSC-020MRO Supply ChainIntegration-RequiredPattern O-10: Deferral Compounding

Definition

The fraction of emergency POs, substitutions, and expedited shipments that recur for the same root cause across multiple sites within a defined window, surfacing accumulated supply chain debt that single-site emergency-PO percentage cannot detect.

The Measurement Gap

Legacy MRO supply chain metrics treat emergency decisions as independent events. Emergency PO percentage is a site-level rate. Substitution rate is similar. Neither connects events across sites or across time. When an emergency PO is placed at Plant A for a hydraulic motor because a substitution six months ago failed prematurely, and a similar emergency PO appears at Plant B the next month for the same motor and same root cause, and Plant C the month after that: each is treated as an independent event. Site-level emergency-PO percentages stay roughly stable while the same underlying root cause produces recurring emergency response across the network. The operation accumulates supply debt: root causes that have not been fixed but are being patched repeatedly. Without a metric detecting this compounding pattern, structural fixes never get prioritized over symptom suppression. The decision SDCI supports: whether emergency-PO and substitution patterns indicate an upstream supplier or forecast root cause needing structural fix, and whether deferrals are masking the need for sourcing strategy change.

Formula

SDCI = recurrences_within_window / total_emergency_decisions

Variables:

  • recurrence = same root cause (same vendor + same SKU + same failure mode pattern) within 90 days at any site
  • emergency_decisions = emergency POs + substitutions + expedites
  • Root-cause matching tiers: exact match, near-match (same vendor + same SKU class), category-match (same failure category)

Worked example: Last quarter, 1,420 emergency decisions across the network. 384 had the same root cause as another emergency decision within 90 days at any site. SDCI = 384 / 1,420 = 0.270. By root-cause category: recurrent forecast-miss-driven emergencies SDCI = 0.34 (worst); vendor-quality-driven SDCI = 0.22; expediting-driven SDCI = 0.18. The forecast-miss-driven category is the highest-impact fix.

Edge cases: Requires consistent root-cause coding. Many sites do not maintain this. Use multi-tier root-cause matching (exact, near-match, category-match) and report each tier separately. Cross-site visibility requires harmonized SKU and vendor master.

Data sources: Emergency PO events from PO with priority/emergency flag. Substitution events from substitution log. Root-cause coding from emergency-action root-cause field (where present) or manual coding for pilot. Cross-site harmonized SKU and vendor master for recurrence detection.

Proposed formula, pending validation pilots.

At a Glance

Unit
Percentage
Trend Direction
Lower
Reporting Frequency
Quarterly
Category
G - Workforce Atrophy & Hidden Supply Debt
← Rationalization Regret Rate (RRR)Supply Workforce Atrophy Index (SWAI) →

Assess Your Organization

The AI-GPS Assessment evaluates your AI governance maturity and recommends KPIs like this one for your implementation roadmap.

Take the Free AI-GPS Assessment