Critical Spare Delivery-to-Window Alignment (CSDWA)

GMI-MAR-040Maritime IndustriesIntegration-Required

Definition

Percentage of critical spare procurements where the part arrives before the vessel at the planned location.

The Measurement Gap

What This Metric Measures

CSDWA measures the percentage of PdM-triggered critical spare part procurements where the part arrives at the planned maintenance location before the vessel arrives. It quantifies whether the logistics chain can deliver parts to a moving target within the maintenance window: the unique maritime challenge of coordinating a part shipment to a fixed port with a vessel voyage to the same port.

The Decision It Supports

When PdM predicts a critical failure and a maintenance port is selected, will the part get there before the vessel does? If not, the superintendent must change the maintenance port, advance the maintenance, divert the vessel, or defer the repair. CSDWA measures the logistics execution that determines whether any of these contingencies are needed.

Why Legacy Metrics Cannot See This

Legacy procurement metrics track order-to-delivery lead time, supplier on-time delivery rate, and procurement cost efficiency. These metrics evaluate the procurement chain against its own standards. They do not measure whether the delivery aligns with the vessel's arrival at the maintenance port. A procurement system might report 95% on-time delivery (parts shipped within the promised window) while 30% of those deliveries arrive after the vessel has already departed because the vessel's schedule and the parts' delivery schedule were never synchronized. CSDWA measures the synchronization directly: did the part beat the vessel to the port?

Formula

Primary Formula

CSDWA = Parts_delivered_before_vessel / Total_PdM_critical_procurements

Companion metric: Delivery Gap:
Delivery_gap = Vessel_arrival_date − Part_delivery_date

Variable Definitions

  • Parts_delivered_before_vessel = critical spare parts that arrived at the maintenance port before the vessel's arrival (count)
  • Total_PdM_critical_procurements = all PdM-triggered critical spare procurement events (count)
  • Delivery_gap = positive values mean the part arrived first, negative values mean the vessel arrived first (days)

Units:

Percentage for CSDWA, days for Delivery_gap. Track both mean and worst-case delivery gap to understand the distribution of alignment failures.

Edge Cases

Vessel diverted to a different port than originally planned requires recalculating against the actual maintenance port. Part shipped to the correct port but held in customs counts as "not delivered" regardless of whose fault the delay is: the part is not available to the vessel. Minimum sample of 15 critical spare procurement events per quarter for reliable rate computation.

Proposed formula, pending validation pilots.

At a Glance

Unit
Percentage
Trend Direction
Higher
Reporting Frequency
Per procurement event
Category
Maintenance Supply Chain Intelligence
← NLP Maintenance Event Classification Accuracy (NMECA)PdM-Procurement Synchronization Rate (PPSR) →

Assess Your Organization

The AI-GPS Assessment evaluates your AI governance maturity and recommends KPIs like this one for your implementation roadmap.

Take the Free AI-GPS Assessment