Dry-Dock Class Survey Synchronization Index (DDCSI)

GMI-MAR-035Maritime IndustriesPilot-Ready

Definition

Degree to which AI dry-dock timing aligns with the class survey program.

The Measurement Gap

What This Metric Measures

DDCSI measures the degree to which AI-recommended dry-dock timing aligns with the vessel's class survey program. It computes the percentage of class survey items (special survey, intermediate survey, boiler survey, tailshaft survey) that fall within a synchronization window of the recommended dry-dock date, indicating how many survey items can be completed during the dock versus requiring separate survey mobilizations.

The Decision It Supports

Is the AI's dry-dock timing recommendation minimizing total survey lifecycle cost by synchronizing dock and survey, or is it optimizing dock timing in isolation and creating expensive survey misalignment? Every survey item not synchronized with the dock requires a separate surveyor mobilization, port call, or remote survey arrangement, each carrying its own cost and operational disruption.

Why Legacy Metrics Cannot See This

Legacy dry-dock planning evaluates dock timing against hull performance degradation, yard availability, commercial schedule, and cost per day in dock. Survey timing is managed separately by the DPA and superintendent based on certificate validity windows. When the AI recommends an optimal dock date based on hull condition and yard pricing, nobody systematically checks whether that date captures the maximum number of upcoming survey items. The AI might recommend docking 3 months before special survey is due (saving $50,000 on yard rates) while creating a $200,000 additional survey mobilization cost 3 months later. No metric connects dock timing optimization to survey lifecycle cost. DDCSI forces the connection by measuring synchronization directly.

Formula

Primary Formula

DDCSI = Survey_items_synchronizable_with_dock / Total_survey_items_in_cycle

Variable Definitions

  • Survey_items_synchronizable_with_dock = class survey items whose due date window overlaps with the AI-recommended dry-dock date plus or minus 6 months (count)
  • Total_survey_items_in_cycle = all class survey items due within the current 5-year survey cycle (count)

Units:

Percentage. 100% means every survey item can be completed at the dock. 50% means half the survey items will require separate arrangements outside the dock period.

Edge Cases

Some survey items must be done in dry-dock by definition (bottom survey, propeller survey) and these automatically synchronize. The value of DDCSI is in the flexible items that can be done at dock or separately, such as boiler surveys, safety equipment surveys, and some machinery surveys. Class society continuous survey programs have more scheduling flexibility than traditional survey programs: adjust the item counting methodology for continuous survey vessels. Minimum measurement is per dry-dock planning decision since each decision carries significant financial consequences.

Proposed formula, pending validation pilots.

At a Glance

Unit
Percentage
Trend Direction
Higher
Reporting Frequency
Per dry-dock planning decision
Category
Dry-Dock & Survey Optimization
← AI Dry-Dock Scope Completeness (ADDSC)Remote Survey Defect Detection Equivalence (RSDDE) →

Assess Your Organization

The AI-GPS Assessment evaluates your AI governance maturity and recommends KPIs like this one for your implementation roadmap.

Take the Free AI-GPS Assessment